Bedford Heights, Bedford

Architect:

reForm Architects

Est. Build Costs:

Undisclosed

The Works

Symmetrys Limited were appointed as Structural Engineers for the refurbishment of this striking commercial building in Bedford. Bedford Heights was built by Texas Instruments in 1960. The building was installed with a cyclone proof roof, being a blue print lifted from the Texas Headquarters at that time in Dallas. In 1999 the building was transformed into fully managed office spaces. Our client brought the property in 2014 and part of the refurbishment works that Symmetrys have been involved with have included the refurbishment of the courtyards and the communal areas.