BUGS Building, London Zoo

Architect:

Wharmby Kosdon

Construction Cost:

£7m

The Works

Russell Thomas of Symmetrys was the lead structural engineer for this new public building with London Zoo, using geothermally-cooled termodeck slabs onto an exposed glulam and ply timber and steel frame, with adjoining part-buried concrete shell educational buildings.