The Works
Topek Southern Ltd. Were employed to carry out remediation works to bring the façade elements of the building in-line with current fire regulations. The intent was to replace any elements of the façade that did not meet current regulations. A full investigation of the building was carried out to determine the current façade build-up back to structure. A replacement system was then developed.
Symmetrys were employed to provide structural engineering calculations to ensure the structure of the building could accommodate the changes to the building envelope. Weights for the current systems, along with weights for replacement systems were provided, along with a copy of the project wind load calculations.
A calculation and reports were required for submission to the client, and support in the form of checks were also needed during the development process, to ensure the proposed replacement systems did not present an issue with the building structure. Symmetrys engaged actively in the process and visited project during the on-site investigations. Symmetrys also reviewed of the existing investigation reports in order to advise of any further investigations deemed necessary. To add to our challenges the Tesco’s store at ground level, remained in operation through the entire works.
