The Works

Symmetrys were appointed as Structural and Civil engineers on Cobham in 2017.  Expectations of our services have been exceeded by:

  • Reducing the number of soakaways required by retesting percolation rates at different depths as well as in different locations. This resulted in significant savings in the costs of the ground works.
  • Utilising additional ground bearing capacity by undertaking additional ground investigations.  This reduced the size of the foundations by 40%.

Sign Up To Our On Reflection Newsletter

Thank you for subscribing.